| ISSUES & ANSWERS |
|
| |
|
| |
|
2003 Load Forecast Study, PSE |
| Power System Engineering, Inc., Madison, Wisconsin, was contracted by the Escanaba Electrical Department to perform a Load Forecast Study. The study was issued in October, 2003. It can be obtained at the following link: Escanaba Electrical Dept |
| |
|
2003 Supply Alternative Study, PSE |
| Power System Engineering, Inc., Madison, Wisconsin, was contracted by the Escanaba Electrical Department to perform a Power Supply Alternative Study. The study was issued in October, 2003. It can be obtained at the following link: Escanaba Electrical Dept |
| |
|
2004 Economic Evaluation of Power Supply, PSE |
| Power System Engineering, Inc., Madison, Wisconsin, was contracted by the Escanaba Electrical Department to perform an Economic Evaluation of the Power Supply. The study was issued in May, 2004. It can be obtained at the following link: Escanaba Electrical Dept |
| |
|
2006 Environmental Fatal Flaw Analysis, RTP Assoc. |
RTP Environmental Associates,Cedarburg, Wisconsin, was contracted by the Escanaba Electrical Department and WPPI to perform an Environmental Fatal Flaw Analysis of the existing facility. The study was issued in February, 2006. click for more info... |
| |
|
Clean Air Interstate Rule (CAIR), Mercury Rule (CAMR) |
Clean Air Interstate Rule (CAIR) and Clean Air Mercury Rule (CAMR)are new Federal requirements that regulate emissions of SO2, NOx, and Mercury through a cap and trade program. click for more info... |
| |
|
| |
|
|